Scientific Development Research . 2026; 6: (2) ; 76-79 ; DOI: 10.12208/j.sdr.20260038.

Research on construction progress management of building engineering
建筑工程施工进度管理的研究

作者: 刘文朋 *

周口市政府投资项目代建中心 河南周口;

*通讯作者: 刘文朋,单位:周口市政府投资项目代建中心 河南周口; ;

发布时间: 2026-03-22 总浏览量: 25

摘要

随着我国建筑工程向着规模化和复杂化的发展,建筑施工过程中的进度管理已成为影响工程质量、安全、成本和企业核心竞争力的关键环节。本文以该研究相关文献为分析范围,采用文献综述法、案例分析法等方法,系统剖析自然因素、项目管理人员素质、劳务班组经验能力三大关键因素的作用机制与影响程度,研究表明,自然因素对进度影响最为显著,是主要外在干扰源;管理人员能力、劳务班组协同能力为主要人为影响因素。构建“前期准备-计划编制-过程监控-偏差调整-结果总结”闭环管理流程,并配套针对性措施,可使进度管理效率大幅度提升,显著降低工期延误风险,为企业优化进度管理、减少工期延误提供理论支撑与实践指导,具有重要工程应用价值。

关键词: 建筑工程;施工进度;闭环管理

Abstract

With the development of China's construction projects towards scale and complexity, schedule management during the construction process has become a crucial link that affects project quality, safety, cost, and the core competitiveness of enterprises. Taking the literature related to this research as the analysis scope, this paper adopts methods including literature review and case analysis to systematically analyze the mechanism and influence degree of three key factors: natural factors, the quality of project management personnel, and the experience and ability of labor teams. The research indicates that natural factors exert the most significant impact on the schedule and serve as the primary external interference sources; the competence of management personnel and the collaborative capability of labor teams are the main human-related factors. By constructing a closed-loop management process of “preliminary preparation-plan formulation-process monitoring-deviation adjustment-result summary” and supporting it with targeted measures, the efficiency of schedule management can be greatly improved, the risk of schedule delay can be significantly reduced, which provides theoretical support and practical guidance for enterprises to optimize schedule management and reduce construction period delay, and thus possesses important engineering application value.

Key words: Construction engineering; Construction progress; Progress management

参考文献 References

[1] 刘毅.Project软件在建筑工程项目进度优化管理中的应用[D].河北工程大学,2011.

[2] 杜玉民.建筑工程施工进度的控制与管理[J].当代经济,2012,(18):16-17.

[3] 刘伯能.探讨进度管理在建筑工程管理中的重要性[J].城市建筑,2014,(02):115.

[4] 黄文需.建筑工程施工进度计划和控制方法研究[J].中国住房设施,2021,(11):159-160.

[5] 柳茂.基于BIM技术的建筑施工进度优化研究[J].现代电子技术,2017,40(03):103-105.

[6] 巩朋林.建筑施工承包企业劳务用工问题研究[D].东南大学, 2015.

[7] 袁江.工程项目施工劳力季节性紧缺的研究[D].山东大学, 2009.

[8] 葛彦,董潇潇,张亚东.基于BIM技术的建筑工艺分析与施工进度管理[J].智能建造,2025,(08):84-87.

引用本文

刘文朋, 建筑工程施工进度管理的研究[J]. 科学发展研究, 2026; 6: (2) : 76-79.